Collecting a booking early (within the bookings lead period) with a
due date override before the booking start syncs end_date to a date
that precedes start_date. Koha::Booking->store has no interval
validation and the clash checks' date windows never see the inverted
period, so the broken row is stored silently - reproduced via AddIssue
on this patchset.
- pull start_date back to the checkout date whenever the synced due
date precedes it, in both AddIssue and AddRenewal, so the booking
window follows the loan instead of inverting
- cover both paths in Circulation.t; the AddRenewal case needs the
Biblio::check_booking exemption from the previous patch, as the
synced window no longer overlaps the stored one
Test plan:
1. prove t/db_dependent/Circulation.t
2. Set bookings_lead_period to e.g. 5 for an itemtype and enable
SpecifyDueDate
3. Book an item of that itemtype for a patron starting in 3 days
4. Check it out to them today with an explicit due date of tomorrow
5. Without this patch the booking is stored with end_date before
start_date; with it both dates follow the checkout period
Signed-off-by: Paul Derscheid <paul.derscheid@lmscloud.de>
Signed-off-by: Pedro Amorim <pedro.amorim@openfifth.co.uk>