Debian stable's version of Test::More is older than the one I used on my
12.04 dev box, and doesn't support subtests, which I used to avoid side
effects between different test scenarios.
This patch removes that subtest definition.
Signed-off-by: Robin Sheat <robin@catalyst.net.nz>
Signed-off-by: Katrin Fischer <Katrin.Fischer.83@web.de>
All tests pass.
Signed-off-by: Jared Camins-Esakov <jcamins@cpbibliography.com>
Signed-off-by: Chris Cormack <chrisc@catalyst.net.nz>
All tests passing in 3.10.x
Signed-off-by: Chris Cormack <chrisc@catalyst.net.nz>
All tests passing in 3.8.x
useDaysMode=Datedue wasn't used as advertised in the docs. Added
next_open_day and prev_open_day subs to Koha::Calendar and some tests for them.
- Koha::Calendar->addDate was rewritten in a more sane way (also split into
addHours and addDays for convenience).
- Fixed a bug introduced in Bug 8966 regarding dt truncation and dtSets->contains
- Minor docs typos
- Use the passed Calendar mode or default to 'Calendar' in Koha::Calendar->_mockinit.
- Tests
I'm writing some db-dependent tests for is_holiday, and hopefully for CalcDateDue so any
rewrite/followup doesn't break things.
Regards
To+
Sponsored-by: Universidad Nacional de Córdoba
Signed-off-by: Kyle M Hall <kyle@bywatersolutions.com>
Signed-off-by: Katrin Fischer <Katrin.Fischer.83@web.de>
Passed-QA-by: Paul Poulain <paul.poulain@biblibre.com>
Signed-off-by: Jared Camins-Esakov <jcamins@cpbibliography.com>
Conflicts:
t/Calendar.t
Signed-off-by: Chris Cormack <chrisc@catalyst.net.nz>
* Create a local copy of the date instead of calling truncate directly on the date
* Add a test to properly test that the issue is fixed
Signed-off-by: Tomas Cohen Arazi <tomascohen@gmail.com>
Signed-off-by: Paul Poulain <paul.poulain@biblibre.com>
Signed-off-by: Chris Cormack <chrisc@catalyst.net.nz>
This patch backports the following patches
from master to 3.8.x:
commit d786d7c7b6c2894cca6231cae3deee9c9d43120b
Author: Colin Campbell <colin.campbell@ptfs-europe.com>
Date: Tue Jul 24 15:16:10 2012 +0100
Bug 8486 Correct calculation of days_between
There were errors in the calculation used for days_between
which caused incorrect values to be returned
Added tests to validate calculation
NB Tests still need to be provided for the hourly
calculations
commit 8379a9781dbf16bcb53b55b20f15dcd55ff948Oc2
Author: Colin Campbell <colin.campbell@ptfs-europe.com>
Date: Wed Jul 25 10:55:56 2012 +0100
Bug 8486 Merge Calendar test files
Moves the tests previously in t/Kalendar.t to t/Calendar.t
and removes the old file.
Note the existing minimal test of C4/Calendar still called in
t/Calendar
Signed-off-by: Chris Cormack <chrisc@catalyst.net.nz>
Input.t was replaced because it tested a now obsolete function.
Input.pm has that function commented out.
Several files were renamed to match their counterparts or
correct misspellingz.
Signed-off-by: Chris Cormack <crc@liblime.com>
Signed-off-by: Joshua Ferraro <jmf@liblime.com>