Commit Graph

5 Commits

Author SHA1 Message Date
Nick Clemens 5867cf7a40 Bug 26457: [19.11.x] Throw exception if update of issues table fails
While this won't prevent the deadlock, it should catch the case where
a deadlock causes the DB update to fail and provide feedback to the user
and rollback the transaction

I don't know how to trigger the deadlock, I can only confirm that we see it, and
that this should catch it.

To test:
1 - Apply patches
2 - Checkout several items to a patron
3 - Confirm that 'Renew all' feature continues to work as expected and all items are renewed

Signed-off-by: David Nind <david@davidnind.com>

Signed-off-by: Marcel de Rooy <m.de.rooy@rijksmuseum.nl>

Bug 26457: Unit test

Signed-off-by: David Nind <david@davidnind.com>

Signed-off-by: Marcel de Rooy <m.de.rooy@rijksmuseum.nl>

Bug 26457: (QA follow-up) Switch to PK index in UPDATE on issues

The deadlock reports tell us that multiple transactions are
waiting for a X lock on a record but using a secondary index
on borrowernumber and itemnumber. Since we have the issue_id
at hand already, we should use that and benefit from the clustered
index (on PK) instead of using a secondary index.

Signed-off-by: Marcel de Rooy <m.de.rooy@rijksmuseum.nl>
Signed-off-by: Victor Grousset/tuxayo <victor@tuxayo.net>
2021-03-24 00:39:44 +01:00
Andrew Isherwood c48af49ded Bug 7088: Allow renew on hold items with due date
This patch adds the ability for items that are on hold to be renewed with a due date specfied by the user. It is enabled by the new "AllowRenewalOnHoldOverride" syspref. It is manifested in two locations:

1. In the "Checkouts" table on the Patron Details screen. It is now possible to select on loan items that would otherwise fulfil a hold request to be renewed. When such an item is selected, an additional date selection box is displayed to allow the user to specify the due date for all on hold items that are to be renewed.

2. In the Circulation > Renew alert screen. When a barcode of an on loan item that would ordinarily fulfil a hold request is entered, the usual alert is displayed indicating that the item is on hold, it is still possible to override this, and renew, however it is now also possible to specify a due date.

Test plan:

- Go to the Patron Details page for a patron who has an item on loan that would fulfil an outstanding loan request.
- TEST: Observe that it is NOT possible to select this item
- Enable the "AllowRenewalOnHoldOverride" syspref
- Return to the Patron Details page for a patron who has an item on loan that would fulfil an outstanding loan request.
- TEST: Observe that it IS possible to select this item
- Select the item
- TEST: Observe that an additional "On hold due date" input box is displayed
- De-select the item
- TEST: Observe that an additional "On hold due date" input box is hidden
- Select the item
- In the "On hold due date" input box, select a due date for the item
- Click "Renew or check in selected items"
- TEST: Observe that the item is renewed as usual
- In the "Renewal due date" input box, select a due date
- Remove the contents of the "On hold due date" input box
- Click "Renew or check in selected items"
- TEST: Observe that the item is renewed by falling back to the "Renewal due date" value if a value is not specified in the "On hold due date" input box
- Remove the contents of the "Renewal due date" input box
- Click "Renew or check in selected items"
- TEST: Observe that the standard loan period is used for the renewal period if no due date is specified in either box
- In the "On hold due date" input box, select a due date for the item
- In the "Renewal due date" input box, select a different due date
- Click "Renew all"
- TEST: Observe that all non on hold items are renewed using the value in "Renewal due date" and on hold items are renewed using the value in "On hold due date"
- From the main staff client from page, choose "Circulation", then choose "Renew"
- Enter the barcode of an item that you know to be on hold and submit
- TEST: In the alert box that appears, observe that a date picker is
displayed
- Choose a due date for this item, then click "Override and renew"
- TEST: In the "Item renewed" box, observe that the item has been
renewed to the date specified

Sponsored-by: Cheshire Libraries Shared Services
Sponsored-by: Halton Borough Council
Sponsored-by: Sefton Council

Signed-off-by: Andrew Farthing <Andrew.Farthing@sefton.gov.uk>

Signed-off-by: Liz Rea <wizzyrea@gmail.com>

Signed-off-by: Katrin Fischer <katrin.fischer.83@web.de>

Signed-off-by: Nick Clemens <nick@bywatersolutions.com>
2019-05-09 14:40:49 +00:00
Jonathan Druart c133bedf54 Bug 16154: Fix some other occurrences
Signed-off-by: Owen Leonard <oleonard@myacpl.org>
Signed-off-by: Katrin Fischer <katrin.fischer.83@web.de>

Signed-off-by: Brendan Gallagher <brendan@bywatersolutions.com>
2016-04-26 23:16:44 +00:00
Jonathan Druart a011cbd2e2 Bug 11298: Don't force the renew time to 23:59
If you try to renew an item using the "Renewal due date" at the bottom
of the checkouts table, the time will be hardcoded to 23:59 no matter
what the user has chosen.

Test plan:
Check an item out to a patron
renew the item and specify a due date using the datetime picker plugin
at the bottom of the table
Confirm the time you have chosen is correctly used.

Followed test plan. It works as advertised.
Signed-off-by: Marc Véron <veron@veron.ch>

Signed-off-by: Katrin Fischer <katrin.fischer.83@web.de>
Signed-off-by: Tomas Cohen Arazi <tomascohen@theke.io>
2015-10-19 11:51:28 -03:00
Tomas Cohen Arazi 6cc316f999 Bug 11703: (qa followup) consistency in svc
This patch removes the trailing .pl from the introduced svc scripts.
Also removes a leftover (wrong license text)

Signed-off-by: Tomas Cohen Arazi <tomascohen@gmail.com>
2014-07-03 12:38:13 -03:00